CNC CONTOUR CUTTING. INSTALLATION AND COMMISSIONING. GERMANY 2024

A job that, at first glance, could appear easy to be done, in fact, it requires time and skilled people to do it. Two people, two days are generally needed to mount a CNC cutting machine, including putting into operation and operator training. This first part of the work is the installation of the machine, after the job place have been prepared in advance by the user. Also, handling equipment should be put at disposal, as large parts of the machine should be handled during mounting.

After the mechanical parts have been assembled, the electronic part of the machine is connected, and the machine is put into operation. The first trials together with the training of the operator are done afterwards. When selling a machine, we generally include all these in our offer, as an added value to our offer. However, the customer can choose either to be comfortable with all these done or to do it on its own.

It should be mentioned that the machine put into operation is a second-hand machine, and this is the added value that we brought to the sale, as a guarantee of the machine's operation and reliability during the second half of the machine's life.

Folosim cookie-uri pentru a va oferi cea mai buna experienta posibila pe site-ul nostru. Continuand sa utilizati acest site, sunteti de acord cu utilizarea cookie-urilor.
Accept